Residential

1314 Holly Dr., North Myrtle Beach

$875,000

Bedroom 5 bedrooms
Bathroom 4 baths

  • MLS #: 2620915
  • Address: 1314 Holly Dr., North Myrtle Beach, SC 29582
  • Date Listed: 8/24/2026
  • Days on Market: 45
  • SQFT: 2796
  • Acres: 0.22
  • Stipulations: None
  • Subdivision: Not within a Subdivision

Location Location

Agent Comments Agent Comments
This Luxuriously Updated and Open Concept Beach home is in one of the Most Sought-After locations in Myrtle, with being a short walk to the beach and close proximity to Top Restaurants and Shopping. This exceptional property is ideally suited for a primary residence, vacation retreat, or income-producing investment. Designed to comfortably sleep up to 18 guests, the expansive home features 5 bedrooms and 4 full bathrooms thoughtfully arranged across two levels. Large Driveway making it an exceptional option for RV's to also add onto your Short Term Rental Lease! Discover the perfect blend of coastal living, spacious comfort, and investment potential in this Beach Home! The stylish open-concept living area showcases beautiful Rare Quartz Countertops, well appointed Backsplash, Luxurious Light Fixtures and Mirrors, custom accent walls, and a cozy fireplace that creates an inviting gathering space. The Chef's Kitchen offers a waterfall Kitchen Island open to the Living Room and Dining area giving a luxurious vibe and open feel to it. The Main level also features two additional bedrooms, including a second primary suite with a striking accent wall, along with two full bathrooms. A sophisticated bonus room with rich, dark tones and a dedicated TV lounge provides the perfect setting for entertaining, relaxing, or enjoying movie nights after a day at the beach. Upstairs offers three bedrooms, including a primary suite, and two full bathrooms, with an oversized bedroom featuring a seating area and sleeping accommodations for up to six guests. Another upstairs bedroom includes two queen beds and generous closet space, providing exceptional flexibility for family and guests. Beautiful brick paver flooring enhances the rear entry, while luxury VP flooring runs throughout most of the home for a polished and durable finish. Thoughtful details include convenient pocket doors in several bathrooms, pull-down attic storage, under-stair storage, tasteful artwork, vinyl siding, and Bahama shutters on most windows. The property also boasts a detached one-car garage with a dedicated shop area and an expansive driveway accommodating up to eight vehicles, offering valuable storage and parking rarely found in a beach-area home. This home is also perfect for RV and Camper Space with NO HOA! Whether you’re looking for a turnkey coastal residence, a spacious vacation escape, or a property with strong rental potential, this remarkable North Myrtle Beach home offers the location, space, and flexibility to make your vision a reality—schedule your showing today!

Amenities Amenities
  • Dishwasher
  • Microwave
  • Range
  • Refrigerator
  • Dryer
  • Washer

Interior Features Interior Features
  • Heat System: Central
  • Floors: Luxury Vinyl, Luxury VinylPlank, Other, Tile
  • Interior: Ceiling Fan(s), Dual Sinks, Furnished, Fireplace, Main Level Primary, Sitting Area in Primary, Separate Shower, Vanity, Window Treatments, Bedroom on Main Level, Entrance Foyer, Kitchen Island, Stainless Steel Appliances, Solid Surface Counters

Exterior Features Exterior Features
  • Parking: Detached, Garage, One Car Garage, Boat, RV Access/Parking
  • Exterior: Storage

Additional Features Additional Features
  • County: Horry
  • Property Type: Detached
  • Tax Number: 2147483647
  • Water/Sewer: Cable Available, Electricity Available, Other, Phone Available, Sewer Available, Underground Utilities, Water Available
  • Year Built: 1983